OFFSHORE OIL PLATFORM DECOMMISSIONING​

PROJECTS Offshore Oil Platform Decommissioning There are numerous Oil & Gas platforms around Australia’s coastline that have come to the end of their operational lifecycle and require decommissioning. Many of these platforms are unmanned, and given their locations and operational environment, are extremely hazardous areas to work and operate within. The client, prior to allowing […]

VIRTUAL PLANT ASSET RECOGNITION

PROJECTS Virtual Plant (Asset recognition) After developing Virtual Plant, Woodside requested RemSense to explore options to recognise assets within the images that are joined together to form Virtual Plant. Despite having a digital twin and inventory systems in place, using the real-world visual information captured in Virtual Plant would help Woodside understand not only their […]

VIRTUAL PLANT

PROJECTS Virtual Plant RemSense was requested to develop a visualisation platform that would enable an operator to view their remote assets in high resolution detail. The operator had previously investigated several digital twin and visualisation offerings but had not found something that matched their needs. In addition to high resolution imagery, the operator wanted the […]

AIR POWERED SPRAY GUN

PROJECTS Air Powered Spray Gun An airless spray pump, that currently used batteries to drive the pump was being discontinued by the OEM. RemSense was asked to create prototype designs for a pneumatically powered spray gun. Solution By utilising pneumatic power, the spray gun can be operated without a hot work permit and ensures the […]

SATELLITE ANTENNA REPAIR

PROJECTS Satellite Antenna Repair An operator of an offshore FPSO engaged RemSense to fix their azimuth axis servo motor controller, a critical component of the antenna tracking system. Without the functioning motor controller, the integrity of the crucial data link for the FPSO was severely degraded. The OEM who engaged to supply a replacement unit […]

SPLIT RING WASHER​

PROJECTS Split Ring Washer The client identified an opportunity to significantly increase the productivity of its maintenance program. The replacement of worn and degraded sealing washers for junction boxes required the isolation and de-powering of the junction boxes and permits to work to be issued. Solution Development of a “split washer” that can be installed […]